When India launched the Jawaharlal Nehru National Urban Renewal Mission in December 2005, it was the most ambitious attempt the country had ever made to fix its cities. Roads, water supply, sewerage, housing for the poor, and the way municipalities themselves were governed were all meant to change together. Nearly a decade later, when the Mission formally closed in 2014, it left behind a complicated balance sheet of new infrastructure, partial reforms, and unfinished projects. Understanding where JNNURM ended up tells us a great deal about what it takes to renew a fast-growing urban nation.

Table of Contents

Overview of the mission’s coverage

JNNURM was launched on 3 December 2005 and ran until 2014, when it was succeeded by the AMRUT programme. It envisaged a total investment of over twenty billion dollars across seven years, making it the largest urban scheme attempted in the country up to that point. The Mission was managed jointly by the Ministry of Urban Development and the Ministry of Housing and Urban Poverty Alleviation, each responsible for a different part of the urban problem.

The programme worked through two main sub-missions. The first, Urban Infrastructure and Governance (UIG), dealt with water supply, sewerage, solid waste management, roads, and urban transport in large cities. The second, Basic Services to the Urban Poor (BSUP), focused on housing and civic amenities for people living in slums and squatter settlements. Two parallel schemes, UIDSSMT and IHSDP, extended similar support to smaller towns.

How the 65 cities were chosen

The Mission identified 65 cities, often called the “mission cities,” which were eligible for assistance. These were selected on the basis of urban population from the 2001 Census and grouped into three categories: mega cities, cities with populations above one million, and selected smaller cities of religious, historic, or tourist importance.

Before a city could draw funds, it had to do two things. First, it had to prepare a City Development Plan (CDP), a strategic document setting a 20-25 year vision for the city and identifying priority projects. Second, the state government and the urban local body had to sign a Memorandum of Agreement (MoA) with the central government, committing to a timetable of governance reforms in exchange for central money. This “reform-linked” design was the heart of JNNURM.

The scale of projects approved

By March 2014, the UIG component alone had sanctioned 538 projects worth about โ‚น60,730 crore across the 65 mission cities. These covered the full range of urban systems, from sewage treatment plants and water networks to storm-water drains and bus rapid transit corridors. All 65 cities had also prepared their City Development Plans by 2012, giving Indian municipalities, many for the first time, a structured planning document to work with.

Major achievements of the mission

JNNURM’s biggest contribution was not any single project but a shift in national attention. The Planning Commission, in its mid-term appraisal of the Eleventh Plan, found that the Mission had been effective in renewing focus on the urban sector across the country and had succeeded in channelling significant investment into the physical infrastructure of cities. Much of that money went into basic services that directly affect everyday life, such as piped water and sanitation.

New infrastructure on the ground

The visible results were substantial. Cities gained new water treatment capacity, sewerage networks, and solid waste systems. Public transport received a major boost: under the bus funding scheme, a total of 15,260 buses were approved for 61 cities at a cost of about โ‚น4,723 crore, modernising fleets in places that had relied on ageing and overcrowded vehicles. For many residents, these buses were the first tangible sign that urban renewal was reaching them.

Housing and services for the urban poor

The BSUP sub-mission promised low-income residents what was described as a garland of seven entitlements: secure tenure, affordable housing, water, sanitation, health, education, and social security. In practice it became largely a housing programme, but it still produced hundreds of thousands of dwelling units for slum dwellers. Research on cities such as Pune showed that outcomes were best where local governments upgraded settlements in place and worked with civil society organisations rather than relocating people to distant sites.

Pushing governance reforms

Perhaps the most lasting achievement was institutional. Because funds were tied to reforms, states and municipalities were nudged to adopt measures they had long resisted: accrual-based accounting, property tax reform, e-governance, and steps towards implementing the 74th Constitutional Amendment on local self-government. The Ministry even introduced performance awards recognising urban local bodies that strengthened governance and service delivery. These changes built administrative muscle that later schemes could draw on.

Ongoing challenges and gaps

For all its scale, JNNURM fell short of its own promises in several important ways, and these shortcomings shaped how its successor programmes were designed.

Slow fund utilisation and incomplete projects

Money moved more slowly than planned. Central assistance was released in instalments, tied to utilisation certificates and the achievement of reform milestones, so delays at the city level held up funding. The clearest sign of trouble was the backlog of unfinished work: when the scheme wound down, about 398 projects remained incomplete because of delays in land acquisition, a shortage of contractors, and court cases. Sewerage projects in some cities became non-starters simply because municipalities could not afford to buy the land they needed.

Reforms that stalled midway

The reform agenda, which was supposed to be the engine of the Mission, lost momentum. The Planning Commission noted that the pace and depth of reforms needed to pick up, and that the 5 per cent of funds earmarked for capacity building could have been used far more effectively. Over time, many cities treated JNNURM mainly as a source of grants for stand-alone projects, with the reform conditions slipping into the background. The link between money and meaningful change weakened.

Projects over holistic planning

A related criticism was that the Mission stayed focused on individual projects rather than the integrated renewal of a city. Although every city produced a City Development Plan, the appraisal found that the emphasis on long-term planning and genuine urban renewal lagged behind project execution. A new water plant or a fleet of buses helps, but it does not by itself make a city more liveable if land use, transport, and services are not planned together.

Future directions for urban renewal

The lessons from JNNURM were absorbed directly into the schemes that followed. In 2015 the government launched the Atal Mission for Rejuvenation and Urban Transformation, or AMRUT, described as the new avatar of JNNURM, covering 500 cities with an allocation of โ‚น50,000 crore. AMRUT 2.0 followed in 2021. These newer missions explicitly built on the foundation JNNURM laid while trying to fix its weak points.

Rethinking how funds and reforms connect

One key change was the way reforms were incentivised. Where JNNURM retained 10 per cent of central assistance as a penalty for not completing reforms, AMRUT instead set aside 10 per cent as a reward for states and cities that did implement them. Switching from punishment to incentive reflected the hard lesson that withholding money tends to stall projects rather than speed up reform.

Giving states more control

AMRUT also reduced central micromanagement. Instead of seeking approval from New Delhi for each project, states now submit annual action plans and progress reports, with funds released against milestones. This responded directly to the bottlenecks that had left so many JNNURM projects incomplete.

Looking ahead, the priorities for genuine urban renewal are reasonably clear. Cities need stronger municipal finances so they can maintain assets after central grants end, faster and fairer land acquisition, real planning that ties infrastructure to land use, and meaningful participation by elected local governments rather than control by parastatals alone. The High Powered Expert Committee estimated that urban infrastructure would require investment running into tens of lakhs of crores over two decades, a figure that dwarfs even the combined outlays of the schemes that came after JNNURM. Closing that gap, while keeping cities inclusive for the poor, remains the central task.

What do you think? Was JNNURM’s reform-linked funding model the right way to push reluctant cities to change, or did tying money to conditions simply slow down projects that people urgently needed? And if you were redesigning a national urban mission today, would you prioritise building infrastructure quickly or strengthening the municipal institutions that have to run it for decades?

How useful was this post?

Click on a star to rate it!

Average rating 0 / 5. Vote count: 0

No votes so far! Be the first to rate this post.

We are sorry that this post was not useful for you!

Let us improve this post!

Tell us how we can improve this post?

References
  1. https://en.wikipedia.org/wiki/Jawaharlal_Nehru_National_Urban_Renewal_Mission
  2. https://www.impriindia.com/insights/jawaharlal-nehru-national-urban-missio/
  3. https://cpiml.net/liberation/2007/07/jnnurm-neo-liberal-mission-indian-cities
  4. https://pib.gov.in/newsite/PrintRelease.aspx?relid=81775
  5. https://www.gktoday.in/jawaharlal-nehru-national-urban-renewal_06/
  6. https://www.environmentandurbanization.org/understanding-contribution-bsup-jnnurm-inclusive-cities-india
  7. http://durgapurmunicipalcorporation.in/achievement.php
  8. https://www.deccanherald.com/india/amrut-empowers-states-urban-growth-2126588
  9. https://nagarnigamraipur.nic.in/sites/default/files/amrut.pdf
  10. https://thesecretariat.in/article/better-funding-decentralised-governance-inclusive-design-hold-key-to-amrut-s-success

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *

Dynamics of Urban Planning and Development

1 Sustainable Development-An Overview

  1. Sustainable Development: Concept and Definition
  2. Components of Sustainable Development
  3. Indicators of Sustainable Development
  4. Measures to Promote Sustainable Development

2 Public Administration And Sustainable Development

  1. Public Administration: Meaning, Scope, and Significance
  2. Role of Public Administration in Development of Nation States
  3. Public Administration and Sustainable Development
  4. Measures for Revitalization of Public Administration
  5. Recent Global Challenges of Public Administration

3 Natural Resource Management And Environment

  1. The Meaning and Types of Natural Resources
  2. Biodiversity: Our Strength
  3. Exploitation of Natural Resources
  4. Threats to Biodiversity
  5. Conservation of Biodiversity
  6. Management of Natural Resources

4 Environment Management System

  1. The Concept of Environmental Management System
  2. Management System: An Overview
  3. Basic Elements of Environmental Management System (EMS)
  4. Environment Management Systems in Municipalities

5 Urban Development Policies- A Global Overview

  1. Changing Global Perspectives on Urban Development
  2. Urban Development Policy Perspectives in USA
  3. Urban Development Policy Perspectives in China
  4. Urban Development Policy Perspectives in Brazil
  5. Urban Development Policy Perspectives in South Africa
  6. Drawing Lessons

6 Urban Development Policy Perspectives In India

  1. Indiaโ€™s Urbanisation: Basic Features and Pattern
  2. Urban Policies and their Impact
  3. Challenges of Managing Urbanisation

7 Urban Development Programmes In India

  1. Urban Development Programmes Initiated Since Independence
  2. Jawaharlal Nehru National Urban Renewal Mission (JNNURM)
  3. Mission Toolkit
  4. Mission Framework
  5. Mission Process
  6. Monitoring Framework
  7. Outcomes of the Project
  8. Status of the Mission

8 Legaland Structural Reforms

  1. Urban Reforms Initiatives
  2. Urban Reform Initiatives: Legal and Regulatory Reforms
  3. Urban Reform Initiatives: Structural Reforms

9 Decentralization- An Overview

  1. Decentralized Planning Process: Meaning and Importance
  2. Guidelines in Decentralized Planning Process
  3. Software Available for Decentralised Planning
  4. Steps in Preparation of Decentralised District Plan
  5. Steps in Preparation of a Village Panchayat Plan
  6. Steps to be Followed in the Preparation of an Urban Local Bodies Plan
  7. Consolidation of District Plan

10 Decentralised Planning Process

  1. Decentralized Planning: Meaning and Concept
  2. Principles of Decentralized Planning
  3. Meaning of Popular Participation
  4. Goals of Decentralized Planning
  5. Actions and Ways Needed for Decentralized Planning
  6. Ways of Practicing Decentralized Planning

11 Rural – Urban Continuum

  1. Rural-Urban Continuum: Concept and Importance
  2. Rural-Urban Continuum – Kerala Model (RURBAN)
  3. Salient Features of the Kerala Model
  4. Factors Promoting Rural-Urban Continuum in Kerala

12 Fiscal Decentralisation-A Global Overview

  1. Fiscal Decentralisation: Exigencies and Dimensions
  2. Municipal Finance
  3. Fiscal Decentralisation in Developed Countries
  4. Fiscal Decentralisation in Developing Countries

13 Fiscal Decentralisation In India- An Overview

  1. Fiscal Decentralisation: Meaning and Importance
  2. Fiscal Decentralisation in India
  3. Sources of Local Government Revenue
  4. Sources of Revenue of Urban Local Bodies in India
  5. Sources of Revenues of Panchayati Raj Institutions in India
  6. Criteria for Fiscal Devolution
  7. Measures for Strengthening Fiscal Decentralisation

14 Municipal Finance In India

  1. Importance of Municipal Finance in Urban Development
  2. Overview of Municipal Finance in India
  3. Estimated Investment Requirements, Norms and Standards
  4. Mechanism to Improve Municipal Revenue
  5. New Areas for Improving Municipal Resources

15 Meaningand Classification Of Disasters

  1. Classification of Disasters
  2. Global Dimensions of Disasters
  3. Overview of Natural Disasters in India
  4. Overview of Man-Made Disasters
  5. Vulnerability Profile of India
  6. Environmental Concerns
  7. Development vs Environment

16 Disaster Management โ€“Recent Trends

  1. Overview of Recent Trends in Disaster Management
  2. Disaster Management in Mountainous Areas
  3. Disaster Management in Riverine Regions
  4. Disaster Management in Coastal Regions
  5. Strands in Disaster Management

17 Community Based Disaster Management

  1. Concept of Community Based Disaster Management (CBDM)
  2. Principles, Strategies, and Challenges
  3. Requirements in CBDM
  4. CBDM: Approach and Direction
  5. Features of CBDM: Understanding Through Case Studies
  6. Examples in Resilience

18 Disaster Management Strategies

  1. Changing Complexion of Disaster Management
  2. Disaster Management Strategies: An Overview
  3. The Path Ahead